Last update: March 30 2009 |
|
|
March 29 - Epoxy day
Two heaters had been running all night in the garage. This morning the outside temperature was about 5C but in the garage it was about 18C.
Put on even more heaters and rolled the cloth out over the boat.
|
|
|
Smoothed it out |
|
|
and began to apply the epoxy
The wood looks beautiful as it appears.
|
|
|
|
|
|
Two hours later first coat is finished.
The structure of the glass mat is still visible
|
|
|
Afternoon
Added a second coat
Structure of the glass mat disappears and the boat looks more shiny
|
|
|
Evening
Brushed on a third layer
|
|
|
March 30
Trimmed off excess cloth
|
|
|
|
|
This Web Page Created with PageBreeze Free Website Builder
|
|